Site services
Decommissioning Project : Phase 3 Integrity inspection & NDT reporting
2024
Location: WA
Sector: Energy
Overview
As a key partner in Phase 3 of a decommissioning campaign, WPF have been engaged to conduct comprehensive integrity inspections and non-destructive testing (NDT) to assess the condition of offshore assets prior to their removal. This phase of the campaign is crucial to ensuring the structural integrity of the platforms and pipelines, ensuring that they are safe and compliant for dismantling or removal operations. Our technical expertise in NDT and integrity reporting will ensure that the decommissioning process continues to progresses smoothly and safely for our client.
Ongoing support for the campaign is provided by WPF.
Technical details/scope
- Supply project management and engineering support
- Attend hazard workshops and work with client to develop specific documentation, inspection and NDT work packs
- Develop campaign workflow charts
- Provide all inspectors, equipment and consumables
- Perform CVI, Dimensional checks and NDT inspections (ECI/MPI/UT/PMI) of identified members
- Provide NATA NDT reports and additional findings
- Check for NORMS, Residual Hydrocarbons and HAZMAT throughout the platform