Decommissioning Project : Phase 2 Plug & Abandonment

2024

Location: WA

Sector: Energy

Overview

WPF have been engaged to support Phase 2 of a decommissioning campaign,tasked with designing and manufacturing specialised tooling for plugging and abandonment (P&A) activities. This phase of the campaign focuses on the safe and efficient sealing of wells to permanently isolate them, ensuring environmental protection and compliance with decommissioning regulations. Our custom-designed tooling is critical to the success of this phase, providing reliable solutions for sealing, capping, and verifying the integrity of the abandoned wells.

Ongoing support for the campaign is provided by WPF.Technical Details/ Scope

Technical details/scope
  • Design specialised decommissioning tooling to enable the removal the KNA Drivelock Connectors
  • Complete Factory Acceptance tests
  • Mobilise equipment to site and remove the KNA Drivelock Connectors to enable the removal of the Christmas tree assemblies and associated infrastructure
  • Design, Procure and fabricate bespoke tooling adaptors and lifting gear