Overview

Working in close collaboration with our client, Quadrant Energy, WPF designed, manufactured and tested a suite of subsea field abandonment tooling and equipment. This tooling facilitated  the cleaning, pressure testing, and removal of Mechanical Locking  Sleeve Temporary Abandonment( MLS TA) caps as part of a broader decommissioning and field abandonment campaign. Our engineering expertise, coupled with our advanced manufacturing capabilities, ensured the delivery of high-performance tools tailored to the unique challenges of subsea operations.

Technical details/scope

The sub-sea work scope was executed successfully by a team of divers using the WPF tools. This enabled the sub-sea team to safely depress poppet valve to test for any pressure in the existing well head.

Services provided:

  • Early contractor involvement to cover constructability & ergonomics
  • Multiple cleaning & attachment tools designed and fabricated in-house
  • Field Support: Provided offshore support to assist with the deployment and use of the tools during the abandonment campaign Testing :Conducted thorough testing of the tools, including pressure testing and performance trials, to verify their functionality and reliability before deployment.

Tools and equipment designed and manufactured by WPF:

  • Guide base / working platform to land out on 30” MLS conductor joint.
  • Hydraulically operated stinger tool to latch onto 13-3/8” MLS TA Cap, depress poppet valve and measure pressure below the TA Cap.
  • Various cleaning tools to remove organic growth from interfacing areas of the TA Cap.
  • 20” casing tie-back tool for P&A operations.